| PANCHAYAT AND RURAL DEVELOPMENT |
 |
Panchayati Raj Institution (PRI): |
 |
Implementation of Programme through Panchayat Wing |
 |
Implementation of Programmes through Rural Development |
 |
Performance of State Institute of Rural Development, Assam (SIRD) |
|
|
10.1.0
|
The
Directorate of Panchayat and Rural Development has been functioning
with two wings at the State Headquarters, one being Panchayat Wing
and the other Rural Development Wing. Both the wings are implementing
various State Level Programmes and Centrally Sponsored Programmes
through a network of 20 Zilla Parisads, 219 Development Blocks and
2487 Gaon Panchayats (Excluding Gohpur, Roha and Titabar Gaon Panchayats
which have been converted to Town Committees). |
|
|
| Panchayati Raj Institution (PRI): |
10.2.0
|
During
the later part of 2001-2002 the much awaited Panchayat election was
held and the three tier Panchayati Raj Institutions came into effect.
Accordingly, the Zilla Parisad at District level, Anchalik Panchayat
at the Block level and Gaon Panchayat at the village level has been
formed. With a view to empower the Local Self Government, 29 subjects
as mentioned below have already been handed over to the Panchayati
Raj Institutions vide Government Notification No. PDA 336/2001/Pt./80
dt.26.07.2002 |
|
1) Agriculture (including Horticulture) and extension.
2) Land Improvement, implementation of Land Reforms,
Land Consolidation and Soil Conservation. 3)
Minor Irrigation, Water Management and Watershed Development,
4) Animal Husbandry, Dairy and Poultry. 5)
Fisheries. 6) Social Forestry and Farm Forestry.
7) Minor Forest Product. 8)
Small Scale Industries including Food Processing Industries. 9)
Khadi, Village and Cottage Industries. 10) Rural
Housing (including Indira Awaas Yojana). 11)
Drinking Water. 12) Fuel and Fodder. 13)
Roads, Culverts, Bridges, Ferries & Waterways. 14)
Rural Electrification including distribution of Electricity. 15)
Non-Conventional Energy. 16) Poverty Alleviation
Programmes. 17) Education including Primary and
Secondary Schools. 18) Technical Training and
Vocational Education. 19) Adults and Non-Formal
Education. 20) Libraries. 21)
Cultural activities. 22) Markets and Fairs.
23) Health and Sanitation including Hospitals, Primary
Health Centres and Dispensaries. 24) Family Welfare.
25) Women and Child Development 26)
Social Welfare, including Welfare of Handicapped and Mentally Retarded.
27) Welfare of Weaker Sections and in particular
of the Scheduled Castes and Scheduled Tribes. 28)
Public Distribution System. 29) Maintenance of
Community Assets. |
|
|
| Implementation of Programme through
Panchayat Wing: |
10.3.0
|
The
Panchayat Wing basically deals with the PRIs for implementation of
some State Plan Schemes such as Rural Roads, Minor Irrigation Schemes
like digging of canals, Health and Sanitation Schemes like installation
of Ring Well/Tube Well etc. Further, the National Social Assistance
Programme (NSAP), which was implemented by the Social Welfare Department,
has now been transferred to the Panchayat and Rural Development from
1st January’03. This is an earmarked sector scheme. The Central
Sector Schemes like National Programme for Improved Chullah (NPIC)
and National Programme for Bio-gas Development (NPBD) have now been
transferred to the State Sector from the beginning of the 10th Five
Year Plan. The State Government released Rs.43.58 lakh at the last
quarter of 2002 - 2003 to install 437 Nos. of Bio-gas Plants. The
funds released is being utilized in the year 2003 –2004. |
|
|
| Implementation of Programmes through
Rural Development: |
| 10.4.0 |
(i) Swarnajayanti Gram Swarojgar Yojana (SGSY) |
|
This
is a holistic programme covering all aspect of self-employment such
as Organization of the rural poor into Self-help Group (SHG), training,
credit technology infrastructure and marketing. The scheme is funded
by the Central and State Government at the ratio of 75:25. The objective
of SGSY is to assist the rural poor popularly known as “Swarojgaries”
to come above the poverty line by providing them income generating
assets through Bank Loan and Government Subsidy. The subsidy under
SGSY is 30 per cent of the Schematic Cost for the general category
of people subject to maximum of Rs.7500.00. However, in respect of
SC/ST and disabled, it is 50 per cent subject to maximum of Rs.10000.00.
In case of Group Swarojgaries (SHGs), the subsidy is 50 per cent of
the project cost. The Government has emphasized on group approach
and has discouraged the sanctioning of subsidy to Individual Swarojgaries
by issuing circular to have separate identity of the programme from
the earlier IRDP and effective implementation of the programme. The
State Government also fixed a target of Rs.100.00 crore for credit
mobilization through the programme to create self employment avenues
under which Rs.60.92 crore were mobilized upto the end of March, 2003.
The DRDAs at District level are the sole authority for implementation
of the programme. During the year 2002-2003 an amount of Rs.3587.09
lakh was spent under the programme and the numbers of Individual Swarojgaries
assisted were 5043 and the numbers of Group Swarojgaries were 3078.
Thus the percentage of physical achievements were 40.73 and 82.85
respectively. The physical achievement under the programme during
2001-2002 were 48.00 per cent for Individual Swarojgaries and 57 per
cent SHG over the target fixed for the year. |
| Special SGSY: |
|
The
programme has been implementing since 1999-2000 in the form of “Golden
Thread” for development of the indigenous Eri and Muga industry
of Assam in eight selected Districts viz. Goalpara, Dhubri, Kamrup,
Lakhimpur, Dhemaji, Kokrajhar, Karbi-Anglong and Golaght. The targeted
year of completion of the project was 2002 –2003 and upto the
end of the year Rs.802.77 lakh was utilized against the total fund
available Rs.829.05 lakh. The number of SHGs assisted with Bank loan
and subsidy was 171 covering 1775 numbers of Swarojgaries. The assets
created under the project are 20 numbers of Community Spinning and
Weaving Centres, 18 numbers of Muga Seed Production Centres, 20 numbers
of Reeling and Spinning Centres for Muga and 5 numbers Market Yard-cum-Training
Centres. |
|
(ii) Sampoorna Grameen Rozgar Yojana (SGRY stream –
1) |
|
This
is a restructured programme of earlier Employment Assurance Scheme
(EAS). The primary objective of the programme is to create additional
wage employment opportunities for the rural poor living below the
poverty line. The secondary objectives of the programme is the creation
of durable community based social and economic assets for sustained
employment and economic development The scheme is open to all rural
poor who are in need of wage employment. Since the programme is self
targeting in nature and only the minimum wage rate prevailing in the
State are to be paid, hence the persons below the poverty line would
only come under the purview of the scheme. While providing employment
and creating economic assets preference is given to SC and ST people
and 22.5 per cent fund is earmarked for taking up schemes for SC and
ST individual people. |
|
During
the year 2002-2003, an amount of Rs 15924.99 lakh has been spent along
with 118090 MT of Rice distributed to generate 289.69 lakh mandays.
The physical achievement was 82.41 per cent of the target and the
financial achievement was 75.72 per cent over available fund. |
|
The
achievement during the year 2001 – 2002 over fund available
and target were 69.30 percent and 57.38 percent respectively. Physical
assets created under the programme during the year 2002-2003 were
4223 Km. of Rural Roads, 1298 numbers School Buildings, 631 numbers
of Bridges and Culverts and 205 numbers of Community Halls. While
implementing scheme, 40 percent of the fund allocation for a District
was released to the concerned Zilla Parisad, and the remaining 60
percent was released to the concerned Anchalik Panchayat. |
|
(iii) Sampoorna Grameen Rozgar Yojana, Stream –II |
|
This
a restructured Programme of earlier Jawahar Gram Samridhi Yojana (JGSY).
The implementation of the programme is entirely restored to the Gaon
Panchayat to develop infrastructure at village level. During 2002-2003
an amount of Rs.12593.75 lakh was spent in order to generate 227.65
lakh mandays. The percentage of expenditure over available fund and
the physical achievements over target were 80.70 per cent and 59.49
per cent respectively. The infrastructure created under the programme
were 6053 Km. of Rural Roads, 452 numbers of School Buildings, 806
numbers of Bridges/Culverts and 779 numbers of Community Halls. During
the year 2001 –2002 the amount spent in terms of cash and food
grains distributed were Rs.11145.93 lakh and 53338 MT to generate
206.71 lakh mandays. The current years achievements are significantly
higher than the previous year. For special safeguard to the SC/ ST
people 50 per cent of the fund under this scheme was earmarked for
them. |
|
(iv) Indira Awas Yojana (IAY) |
|
The
objective of Indira Awas Yojana is primarily to build up dwelling
units for SC/ST, freed bonded labourers and also non SC/ ST rural
poor Below the Poverty Line (BPL) by providing them Grants-in-Aid
to the tune of Rs.20,000.00 (now enhanced to Rs.22,000.00 from the
year 2002 –2003). A maximum amount of 40 percent of the total
IAY allocation for the year can be utilized for construction of dwelling
units for non SC/ ST rural BPL families. Provision of safeguards for
the woman and disabled person have also been made upto 40 per cent
and 3 per cent of the target respectively. |
|
The
programme is implemented in two separate streams viz. (i) IAY new
construction and (ii) IAY upgradation where 80 per cent and 20 per
cent of the total allocation are used respectively. During the year
2002-2003 an amount of Rs.8303.53 lakh for IAY new construction and
Rs.2122.18 lakh for IAY upgradation had been spent. The physical achievements
were 43043 number of new houses were constructed and 22483 numbers
of houses were upgraded. The percentage of achievement on new construction
and upgradation were 69.22 and 65.74 respectively as against the achievement
of 48.23 and 44.10 per cent respectively during the previous year.
The increase in physical achievement during the current year is due
to the strong and effective strategic steps taken by the State Government.
|
|
(v)Pradhan Mantri Gramodya Yojana (Rural Shelter) |
|
The
programme envisages allocations for additional Central Assistance
to States and Union Territories for selected Basic Minimum Services
in order to focus Human Resource Development in rural areas. The PMGY
has five components and they are Primary Health, Primary Education,
Rural Shelters (Gramin Awas), Rural Drinking Water and Nutrition.
Out of these Gramin Awas is implemented through the Panchayat and
Rural Development Department in Assam. It is fully funded by the Government
of India and implementation strategy is like Indira Awas Yojana (IAY).
During the year 2002 –2003 an amount of Rs.2028.55 lakh under
new construction and Rs.548.20 lakh under upgradation have been allocated
to construct 10667 numbers of new houses as well as to upgrade 3397
numbers houses. The percentages of achievement were 107.37 and 67.94
respectively as against the achievement during year 2001-2002 which
were 27.24 and 32.18 respectively. |
|
(vi) Pradhan Mantri Gram Sadak Yojana (PMGSY) |
|
The
Programme was launched form 2000-2001 with 100 percent share of the
Government of India. The Implementing Agency of the programme is State
Public works Department (PWD). During the year 2002-2003 the Government
of India has not released any fund but the fund released in 2001-2002
were utilised in 2002-2003 to construct 155.420 K.M. roads with black
topping with an expenditure of Rs.7898.07 lakh. |
|
(vii) Integrated Wasteland Development Programme (IWDP)
: |
|
The
programme is being implemented by the Panchayat and Rural Development
Department from the year 2000-2001 where the funding pattern is 90
: 10 between the Central and State Governments. |
|
The objectives of the programme are- |
|
(i) Developing wasteland /degraded lands, draught
prone and desert areas on watershed basis keeping in view of the capacity
of land, site condition and local needs. (ii)
Promoting the overall economic development and improving the socio-economic
condition of poor and disadvantaged sections inhabiting the programme
area. (iii) Mitigating the adverse effects of
extreme climatic conditions such as, draught and de-rectification
on crops, human and livestock population for their overall improvement.
(iv) Restoring economical balance by harnessing,
conserving and developing natural resources in land, water and vegetative
cover. (v) Employment generation, poverty alleviation,
community empowerment and development of human and other economic
resources of the village. |
|
Under
the programme altogether 40 (forty) number of projects have been sanctioned
and are being implemented throughout the State in a phased manner.
Upto the end of March, 2003 an amount of Rs.2145.83 lakh were utilized
against the total available funds of Rs.3856.30 lakh and the physical
achievements on area treated was 39867 hectare against the target
of 289388 hectares. The number of groups trained were 1930 against
the target of 3192 groups. |
|
(viii) NATIONAL PROGRAMME OF BIOGAS DEVELOPMENT (NPBD) |
|
The
programme was implemented under 100 per cent Central Share prior to
the year 2002-2003. Now, the programme has been transferred to State
Government and the Government released an amount of Rs.43.58 lakh
(the fund received from the Central Government in earlier period kept
in State exchequer) to install 437 numbers of Biogas plants at the
fag end of the year, which has been implemented in 2003-04. |
|
The
Table No.-10.1, 10.2 and 10.3 show the achievements under various
Rural Development programmes in Assam during the year 2001-2002 and
2002-2003. |
|
Table No.-10.1 |
|
Table No.-10.2 |
|
Table No.-10.3 |
|
|
| Performance of State Institute of
Rural Development, Assam (SIRD) |
10.5.0.
|
The
State Institute of Rural Development, Assam is actively engaged with
organizing numerous training programmes meant for preparing the ground
for successfu implementation of various rural development schemes
in the State. These field oriented training programmes basically aims
at capacity building of farmers, youths and women of the State so
as to enable them to take up income generating activities. The achievements
of the Institute over the last six years may be seen at Table-10.4 |
10.5.1
|
It
is reported by the Institute that around 6000 SHGs have been developed
in different parts of the State and efforts also continued to make
these SHGs sustainable. The Institute is also acting as a Nodel Agency
for implementation of innovative projects under SGSY and accordingly
taking up activities like modernization of agricultural activities,
extension of facilities to farmers, popularization of mushroom production,
dairy farming, development of Assam Silk, women empowerment through
poultry farming etc. |
10.5.2
|
With
a view to provide credit support to the SHGs of the State the Institute
has established a good networking with the Nationalised and Regional
Rural Banks and the response has been found to be quite encouraging.
Volume of loans sanctioned by different Banks to the SHGs of the State
upto the end of December 2003 may be seen at Table-10.5. |